Block 7 :
➡️ Reinforced concrete slab of the 6th floor was laid:
➡️ Columns, diaphragms and stairs installation works are in progress
Block 6:
➡️ Columns, diaphragms of the 5th floor were poured and stairs were installed;
➡️ Installation works of the 6th floor reinforced concrete slab are in progress