Block 7:
➡️ The allocation of flats has started and is in progress;
➡️ Arranging partitions with blocks are in progress;
➡️ and stairs of the 6th floor were arranged;
Block 6:
➡️ The roof tile of 4th floor was poured; Columns, diaphragms
➡️ Arranging works of the 5th floor stairs and diaphragms are in progress